Noticias

Case Study : Sytner BMW Warm up with Reznor

Having a new state of the art Showroom, it was only appropriate to have a high efficient heating system to provide constant customer comfort within Syter BMW's new building. Reznor rose to the challenge, providing them with Warm Air Heaters that maintained a consistent 20-21 degrees temperature.

Leer más...

Case Study : Reznor Downflow Unit Strikes a 'cord'

Richards of Aberdeen invested in thirty Reznor V3 downflow high efficiency indirect gas fired warm air unit as they provide a high Efficiency Heating Solution, draught free environment, whilst also having optimum heat distribution.

Leer más...

Case Study : Health Authority Trust in the Swim with Air Mixing

Having undergone a complete refurbishment, Salisbury Hospital needed a new heating system for their new leisure complex, constant comfort temperatures and having a safe environment were key factors to the requirement. Reznor UK being no stranger to this sort of application installed an air mixing system which provides a comfortable environment whilst eliminating condensation problems; fulfilling all the requirements established.

Leer más...

Noticias de Productos : The Natural Solution for Nortel

Nortel Networks sought an alternative heating system to the costly energy inefficient original installation they were used to. Reznor UK provided them with natural gas fired warm air heaters resulting in a huge cost saving of £20,000 per annum with energy savings of over 30% after the first year.

Leer más...


Páginas