信息

Case Study : 'Joust' a Minute isn't that a Reznor Heater??

Kidz Paradise invested in Reznor’s V3 UDSA Sytems, and Air Curtains, to provide them with a constant 16°C comfort temperature and give even heat distribution.

阅读更多...

Case Study : Huge Savings in the First Year at Instron

Instron invested in Reznor’s T2000E Unit. Instron required a system that would provide both heating and ventilation across different zones within their premises; Reznor have not only fulfilled their expectations but exceeded them with a system that completes their requirements but also gave them a cost saving of 35% in the first year.

阅读更多...

Case Study : IBSA Reduces their Carbon Footprint

IBSA invested in a bespoke system based around two of Reznor’s third generation UESA 055 continually condensing gas heaters and four of the company’s Maximizor 3000 heat recycling de stratification fans. They achieved energy savings of up to 15% and exceeded the ECA requirements by almost 13%. IBSA are extremely enthusiastic about reducing their carbon footprint and putting energy at the top of their list; thus why they sought help from Reznor UK, whom provided them with an energy efficient heating system that created energy savings of up to 15%, reducing their energy bills and carbon footprint simultaneously.

阅读更多...

Case Study : Bespoke Solution for East Midlands Airport

East Midlands Airport invested in a bespoke system that effectively warms the interior while counteracting the influx of cold air when the doors are opened. Also using Novojet air distribution nozzle systems. It is Large volume building and required a constant 20°C maintained temperature. East Midlands Airport had for years coped with inadequate heaters to meet the requirements of the building, which is why they called on the experience of Reznor UK to design a bespoke system solving all their concerns.

阅读更多...


页面