Produkte Destratifikation Maximizor (Abgekündigt)

Medien

Maximizor 9001 destratification fan
Maximizor 9001 destratification fan
Maximizor 4501
Maximizor 3001
Maximizor 2101
Maximizor


Beschreibung

Reznor’s Maximizor destratification fans successfully prevent stratification in high buildings.

They are intended for use in commercial and industrial premises, where they provide additional air circulation, improving environmental comfort.

Temperature differences in high buildings of up to  20°C are not unheard of! The Maximizor redistributes warm air from the top of the building more evenly. This increases comfort for staff on the floor level and helps control your operational costs.

Luftvolumenstrom ( m3/h )

Models 4501 and 9001

  • Corrosion resistant cylindrical casing
  • Axial fan with protective  cover
  • Adjustable louvres
  • Thermostat to prevent cold air draughts
  • Eye bolts for suspension

     

Models 2101 and 3001

  • The Maximizor 2101 and 3001 are designed for lower spaces.
  • Corrosion resistant square casing, suitable for heights between 3 and 10 meters.


 


Broschüren
1 Datei

Broschüren


English
Product overview brochure Reznor , English
Product overview brochure of Reznor in English
for Europe and export markets with 50 Hz utility frequency, but excluding UK and North-America, which have their own product range and product overview brochures.
Datei herunterladen
1.7 MB

Case Study : 9-Month Payback on Reznor Warm Air Heating System

Unipart invested in Reznor's XD400 and XB400 gas-fired warm air heaters and Maximizor recirculation fans to ensure significant gain in relation to running efficiencies. The system provided comfortable working temperatures and achieved energy savings of 35% per year.

Mehr lesen...

Case Study : Reznor in Control at Warehousing Facility

Orion Media Marketing required a highly economical solution with minimal greenhouse gas emissions for their new single storey warehouse. M & E Contractors found the ideal solution with Reznor's Warm Air Heating Systems as they provide a reduction in overall fuel consumption resulting in the emission of Ozone depleting gases.

Mehr lesen...

Case Study : O Elliot Sweeps up with Reznor

O Elliott Ltd invested in seven suspended UPA gas-fired warm air units and three Reznor Maximizor recirculation fans were installed in the roof; the directional warmth meets needs of different areas and the horizontal flueing through walls avoids roof penetrations.

Mehr lesen...

Case Study : Reznor is the Right Medicine for Manesty

Manesty demanded specific requirements of the new heating system needed in their new premises; Reznor's warm air heating system answered all the requirements with ease, providing even heat coverage with constant comfort temperatures and having ultimate control and flexibility.

Mehr lesen...